We’ve assisted homeowners for over 65 years and will proudly service your home as well.

If you need a skilled plumber in St. Louis Park, our licensed professionals are equipped to handle any type of plumbing service. We know how disruptive plumbing issues can be. Whether it’s a new installation, routine maintenance, or an emergency fix, we’re committed to providing timely, effective solutions that respect both your time and your budget.
When it comes to electrical work, having a certified electrician ensures your safety and the integrity of your system. Our St. Louis Park electricians provide a range of services to keep your electrical setup efficient and safe. With our expertise and commitment to quality, you can count on our team to deliver dependable, lasting solutions.
When you need electrical, plumbing, indoor air quality and HVAC contractors in St. Louis Park, Hurlburt is your go-to provider for exceptional service. Contact us today to schedule an appointment or to learn more about our services.
Hurlburt Heating & Plumbing has completed 20 jobs in St. Louis Park, MN between April 2025 and May 2026.
The most recent job was on May 14, 2026.
Hurlburt Heating & Plumbing has completed 56 jobs in St. Louis Park, MN in the last 12 months. The first job there was in April 2025.
Responded to service call for malfunctioning exterior hose bibb at commercial property. Upon inspection, determined the existing commercial-grade hose bibb was beyond repair and required full replacement. Assessed the installation location and underlying plumbing infrastructure, including the supply lines running through the basement utility area. Documented the current condition with photographs showing the pipe configuration, insulation, and connection points where the supply line penetrates the concrete floor and extends to the exterior fixture. Prepared a comprehensive replacement estimate for the property manager's review, detailing the scope of work required to install a new commercial-grade hose bibb assembly with proper shutoff valve and freeze protection measures.
Completed prepaid 4Front member maintenance on one Lennox AC system, performing comprehensive tune-up and system inspection. Addressed rodent activity in mechanical area by strategically placing traps around HVAC equipment and related plumbing systems. Verified proper operation of furnace unit, associated ductwork, and venting components during maintenance visit.
Completed annual air conditioning tuneup and inspection on Lennox HVAC system. Verified operational status of all components, inspected 16x25x1 FPR 7 air filter in proper position within air handler housing, and confirmed PVC condensate drain lines are clear with proper labeling. System is functioning within normal parameters with no deficiencies noted at this time.
Completed reset and reinstallation of toilet and pedestal sink in powder room. Upon inspection, discovered the toilet flange was positioned 1/2" below the finished floor level, which would have compromised the seal and stability of the fixture. Installed appropriate flange spacer to bring the mounting surface flush with the floor plane, ensuring proper alignment and secure attachment. Successfully set both the toilet and pedestal sink, restoring full functionality to the fixtures with proper sealing and secure mounting.
Completed annual cooling maintenance visit on 3-year-old AC system with no known issues or concerns reported. Performed comprehensive tune-up inspection per preventive agreement protocol, verifying proper system operation, refrigerant levels, electrical connections, and overall equipment performance. All components found operating within manufacturer specifications with no deficiencies identified or repairs required at this time.
Responded to no heat call on furnace that had been previously serviced approximately one month prior for the same issue. Upon arrival, accessed utility room and performed diagnostic testing on furnace control system. Confirmed defective control board as root cause of heating failure. Removed failed control board from control panel enclosure and installed new replacement board. Reconnected all low-voltage control wiring to proper terminals on new board, ensuring secure connections at all terminal strips and connector blocks. Restored power to unit, verified proper operation of heating system, and confirmed furnace cycled normally through all operational sequences.
Completed scheduled filter replacement maintenance on two rooftop units (Daikin RTUs) per maintenance agreement. Replaced four 16x16x2 filters and two 20x25x2 filters, then dated all new filters for tracking purposes. Documented completion with photos of equipment.
Responded to service call regarding humidifier performance. Upon inspection, discovered damper was closed off, restricting proper airflow to the humidifier. Opened damper to restore proper operation. Verified Honeywell Equipment Interface Module connections and confirmed proper ductwork configuration.
Responded to service call for non-functioning tube heaters on pergola. Diagnosed and cleaned dirty spark igniter and flame rod on one heater, restoring proper ignition and operation. Second heater was functioning correctly but had a burnt-out red indicator light. All heaters now operating properly.
Responded to no heat complaint on unit that had recent tune-up. Inspected system including electrical panel, breaker status, and thermostat functionality. Determined cause was dirty filter with white powder accumulation; customer advised to call back if unit shuts down again to capture diagnostic code.
Responded to service call for Banje tankless water heater displaying error code E110 with no hot water output. Diagnosed issue as screen obstruction; cleared accumulated debris from system which restored normal operation. Unit now functioning properly with temperature set at 125°F.
Responded to service call for pilot light repeatedly extinguishing in aging furnace. Upon inspection, discovered significant heat exchanger deterioration with visible cracking and corrosion, along with a failing blower motor with loose belt. Recommended full system replacement as repair costs would approach replacement value. Set up emergency replacement service due to safety concerns.
Responded to service call for leaky tub faucet. Upon inspection, found deteriorated shower valve cartridge with significant mineral buildup. Removed old Moen cartridge and replaced with customer-supplied replacement part. Successfully restored proper function and eliminated leak.
Completed routine maintenance on 12-year-old Payne furnace. Verified system is operating safely with proper gas pressures, clean filter, and good electrical connections. Performed flame sensor cleaning, ignitor verification, and confirmed inducer amp draw, capacitor readings, and clear condensation drains. No gas leaks detected.
Completed installation of a new main water service valve (up to 1") before the meter and replaced the frost-free hose bibb utilizing existing connections. Service included complete repiping of the meter/main valve assembly and installation of a new exterior frost-proof spigot with proper interior piping through the wooden framing structure.
Diagnosed and repaired a water leak at the valve connection on pipe leading to exterior faucet. Observed significant corrosion and deterioration on copper pipe with damaged insulation and water damage to surrounding wooden structure. Provided bid for main line rebuild due to extensive system deterioration.
Replaced customer-supplied Rheem Performance water heater (Model #XG50T06EC38U1) after original Bradford White unit developed tank leak. Installation included connecting all plumbing lines and testing system. Post-installation inspection confirmed proper operation with no leaks detected.
Responded to no cooling complaint for aging Samsung mini split system. Diagnostic testing revealed complete power loss to the unit, which was also noted to be extremely dirty. Scheduled follow-up appointments for both an electrician to inspect the electrical box and a sales appointment for Tuesday to address the system's condition.
Successfully installed a new Bradford White tanked water heater in customer's utility room. Connected all necessary copper water lines, including hot and cold connections with appropriate valves. Ensured proper venting and confirmed unit was functioning according to manufacturer specifications before completing the job.
Unclog toilet
©2026 Hurlburt. All Rights Reserved.
Privacy Policy | Terms and
Conditions
This site is protected by reCAPTCHA and the Google Privacy Policy and Google Terms of Service apply.