
Hurlburt Heating & Plumbing has completed 7 jobs in Osseo, WI between September 2025 and October 2025.
The most recent job was on October 20, 2025.
Hurlburt Heating & Plumbing has completed 61 jobs in Osseo, WI in the last 12 months. The first job there was in October 2015.
Connected commercial stainless steel utility sink to waterline in utility room. Installed single basin sink with backsplash against wall, ensuring proper water connections. Verified system functionality after installation.
Responded to service call for a clogged urinal. Disassembled the urinal fixture, performed drain snaking procedure to clear the blockage, then reassembled the unit. Verified proper drainage function before completing the service.
Inspected Navien tankless water heater (model NPE2400) exhibiting error codes and found significant corrosion around the recirculation pump and heat exchanger. Recommended tuneup service to address these issues. Also assessed backing up urinal and recommended augering to clear the blockage.
Performed scheduled oil furnace tune-up on 10-2 oil furnace per maintenance agreement. Discovered incorrect nozzle size (.75 installed when .65 was required per burner specifications) and soot buildup in pipes and inspection hall. Replaced with correct nozzle size, vacuumed chambers, inspected heat exchanger, and adjusted air-fuel mixture. Unit is now operating efficiently with proper combustion.
Performed annual furnace tune-up on 3-year-old system. Inspected and verified clean filter, balanced blower, electrical components, heat exchanger integrity, and proper roof ventilation. Confirmed appropriate gas pressures and verified proper operation of first and second stage cycling during 15-minute test run. System functioning normally with no issues identified.
Performed annual Family Rewards furnace tune-up on 3-year-old Lennox system. Conducted comprehensive inspection including electrical components, heat exchanger, gas pressure verification, and blower assembly - all functioning within specifications. System demonstrated proper 50-degree temperature rise during 20-minute operational test with no issues identified.
Completed site visit to estimate installation of customer-supplied commercial produce sink. Discovered installation challenges including lack of accessible drainage and water supply lines, with only limited access through tight quarters behind wall. Documented existing space and utility access points to develop comprehensive installation plan.
©2026 Hurlburt. All Rights Reserved.
Privacy Policy | Terms and
Conditions
This site is protected by reCAPTCHA and the Google Privacy Policy and Google Terms of Service apply.